Free survey for new installsFixed written quoteEngland, Wales, Scotland & NI
Call 0800 088 6248
SkylightCompany.uk
Installation · Greater London

Skylight installation in Surbiton

Skylight installation in Surbiton: a measured specification, a written fixed price and work that pays attention to where leaks really start.

  • Covering KT5 and all of Greater London
  • Planning and building-regs points explained
  • Free survey for new installations

Quote for Surbiton

Free survey for new installs · we aim to reply within one working day

Enter a UK postcode.
Choose an option.
Enter your name.
Enter a phone number we can call.
Check the email address.

We use your details to answer this enquiry and arrange your survey. They pass through our form, chat and hosting providers and are shared only with the surveyor or installer working for us on your job — see our privacy notice.

KT5Postcode district
Greater LondonCounty / region
3 kmto New Malden
£595Guide price from (inc VAT)

How we approach skylight installation in Surbiton

We handle skylight installation across Greater London, including Surbiton. In short: survey, supply and fit — new openings, extensions and fit-only work. The survey checks structure, weathering and orientation, so the quote reflects your actual roof.

Party walls are a fact of life in London terraces, and rooflights close to a shared wall need detailing that keeps the neighbour's side dry too. Think of skylight installation for builders' projects and retrofits into finished roofs.

Surbiton sits about 3 km from New Malden and 4 km from Kingston upon Thames, and we cover the whole KT5 postcode district and the roads in between.

Specification options

  • Electrics coordination
  • Internal plaster reveal
  • New openings with joist trimming
  • Fit only (customer-supplied units)
  • Upstands and flashings
  • Fixed price in writing before work
  • Fitting for builders on new extensions

Things we check at survey

  • Work at height is planned with suitable access
  • Structural changes may need an engineer's check

Planning and building rules for Surbiton

Most rooflights on English houses do not need planning permission, provided they keep within 150 mm of the roof surface and below the ridge line. A rooflight on a side-facing slope must be obscure-glazed, and fixed shut unless the opening part is more than 1.7 m above the floor.

Building Regulations Approved Document L sets a limiting U-value of 2.2 W/m²K for new or replacement rooflights in existing homes, measured in the horizontal plane; roof windows need 1.4 W/m²K or a Band B energy rating. The Future Homes and Buildings Standards, published in March 2026, apply from 24 March 2027 and keep the 2.2 W/m²K limit for rooflights.

See our building regulations guide for U-values, glazing limits and self-certification.

Skylight installation prices in Surbiton

These are typical supply-and-fit ranges. For an address in Surbiton, scaffold, a hoist for heavy glass, or a new structural opening can move the figure, which is why we survey first.

OptionGuide price inc VATEx VAT
New opening in an existing roof, supply and fit£2,395 – £5,395£1,995 – £4,495
Supply and fit into a new extension Typical£1,435 – £3,595£1,195 – £2,995
Fit only, customer-supplied unit£595 – £1,195£495 – £995

From enquiry to finished job

  1. Tell us what you have. Send the KT5 postcode, a rough size and a couple of photos.
  2. Free site visit. For new installs we survey free, measure and confirm the roof detail.
  3. Fixed quote. Product, work and price in writing — nothing is ordered until you agree.
  4. Installation day. Usually one day into a prepared opening, longer for new openings.

Nearby towns

Other services in Surbiton

Questions about skylight installation in Surbiton

How long does installation take?

Fitting into a prepared upstand takes about a day. A new opening in an existing roof, including making good, often takes two to three days.

Is the survey free?

Yes, for new installations. Repair visits are charged.

Do I need a structural engineer?

For new openings that cut joists or rafters, a structural check is sensible and building control may ask for calculations.

Will I need planning permission in Surbiton?

In England a rooflight on a house is usually permitted development under Class C if it projects no more than 150 mm beyond the roof slope and sits no higher than the ridge.

Can you work alongside my builder in Surbiton?

Yes. On new extensions we fit once the opening and upstand are ready and coordinate dates with your builder.

Free survey · fixed written quote

Talk to us about your roof

Tell us where you are and what you have in mind. We aim to reply within one working day.

CallFree quote