A typical skylight installation runs: survey and fixed quote; order and lead time; forming or checking the opening; building and waterproofing the upstand or fitting the flashing; lifting and fixing the unit; sealing; then making good inside. Fitting day is usually one day into a prepared opening, or two to three days for a new opening in an existing roof.
What happens at the survey?
We measure the opening and roof build-up, check structure and access, and talk through glass, opening and blinds. You then get a fixed written quote.
How long is the lead time?
Manufacturers typically quote two to four weeks for standard units; bespoke, structural and motorised units take longer. Your quote states the lead time.
What happens on fitting day?
- Protect the room and set up safe access
- Form or check the opening and upstand
- Dress the membrane or fit the flashing
- Lift the unit into place and fix to the manufacturer's detail
- Seal, test any opening mechanism and clean down
- Make good the reveal inside
Will it be messy?
Cutting into an existing ceiling is dusty. We sheet and protect, but plan to clear the room below.
What paperwork will I get?
Product data, manufacturer warranty details and, where applicable, the building control or competent person certificate route.
This guide gives general information, not legal or structural advice. Rules change and every property is different — check with your council or building control for your address. We review our guides regularly; the date above shows the last review.