Free survey for new installsFixed written quoteEngland, Wales, Scotland & NI
Call 0800 088 6248
SkylightCompany.uk
Flat rooflights · Greater London

Flat rooflights in Willesden

Flat rooflights for homes and businesses in Willesden and the NW10 area, with honest advice and a fixed price before we start.

  • Upstand, flashing and making good set out in your quote
  • Free survey for new installations
  • Covering NW10 and all of Greater London

Quote for Willesden

Free survey for new installs · we aim to reply within one working day

Enter a UK postcode.
Choose an option.
Enter your name.
Enter a phone number we can call.
Check the email address.

We use your details to answer this enquiry and arrange your survey. They pass through our form, chat and hosting providers and are shared only with the surveyor or installer working for us on your job — see our privacy notice.

NW10Postcode district
Greater LondonCounty / region
3 kmto Cricklewood
£1,195Guide price from (inc VAT)

Flat rooflights for Willesden: the essentials

Thinking about flat rooflights in Willesden? The short answer: fixed double or triple glazed rooflights for flat roofs and extensions. The longer answer depends on your roof, which is why we survey before we price.

London homes often run deep from front to back, so the middle of the ground floor is the darkest space — exactly where an overhead rooflight earns its keep. In Willesden, as anywhere, flat rooflights are the usual choice for landings, bathrooms and rear extensions with flat roofs.

Neighbouring towns include Cricklewood (3 km) and Notting Hill (3 km). We offer a survey date when we reply to your enquiry.

Choices for your Willesden project

  • Frame colours: anthracite, black, white or RAL
  • Rain sensor if paired with an opening unit
  • Plastered or lined internal reveal
  • Insulated kerb or timber upstand built to suit
  • Integral or fitted blinds
  • Even, top-down daylight across the whole room
  • Fixed units are simple, quiet and low-maintenance

Things we check at survey

  • Rooflights count toward glazing in an extension, which matters for Building Regulations energy and overheating rules
  • The roof membrane must be dressed up the upstand before the unit goes on

Consents for flat rooflights in Willesden

English householder permitted development (Class C) normally covers rooflights that stand no more than 0.15 m proud of the roof plane and stay below the highest part of the roof. Listed buildings need listed building consent, flats have no householder permitted development rights, and an Article 4 direction can remove the rights in some conservation areas.

Under Approved Document L, a rooflight added to an English home must achieve at least 2.2 W/m²K (horizontal plane), and a roof window 1.4 W/m²K or Window Energy Rating Band B. In an extension, glazing including rooflights is normally limited to 25% of the new floor area plus any windows or doors the extension covers, unless a whole-house calculation shows otherwise.

See our building regulations guide for U-values, glazing limits and self-certification.

Guide prices for Willesden

Prices below are shown including and excluding VAT. In Willesden, as elsewhere, making good inside and access equipment are the main variables.

OptionGuide price inc VATEx VAT
Large or triple glazed (1500 × 2500 mm and up)£2,395 – £4,195£1,995 – £3,495
Mid-size double glazed (1000 × 2000 mm) Typical£1,675 – £2,395£1,395 – £1,995
Small double glazed (up to 1000 × 1000 mm)£1,195 – £1,795£995 – £1,495

How the job runs

  1. Send the details. Postcode, rough size and a photo of the roof and room.
  2. Free site visit. For new installs we survey free, measure and confirm the roof detail.
  3. Agree the quote. You approve the specification and price before anything is ordered.
  4. Installation day. Usually one day into a prepared opening, longer for new openings.

Nearby towns

More we do in Willesden

Questions about flat rooflights in Willesden

Double or triple glazing?

Double glazing suits most domestic jobs. Triple glazing improves thermal performance and cuts noise from rain, which is worth it over bedrooms or where the energy calculation is tight.

How long does it take?

Fitting into a prepared upstand usually takes a day. Forming a new opening in an existing roof, including making good inside, is often two to three days.

Will it make the room too hot?

A big unglazed-to-sky area can add solar gain in summer. Solar-control glass, a blind, or pairing a fixed unit with an opening one keeps it comfortable.

Do I need to be at home for the survey in Willesden?

Yes — someone needs to let us into the room below and, where possible, show us how the roof is reached.

Can you work alongside my builder in Willesden?

Yes. On new extensions we fit once the opening and upstand are ready and coordinate dates with your builder.

Free survey · fixed written quote

Plan the light before you build

Send a photo of the roof and a rough size — we will reply with options, a guide price and a survey date.

CallFree quote